Resource Type

Journal Article 58

Conference Videos 1

Year

2023 1

2022 1

2021 2

2020 1

2017 2

2016 2

2014 2

2013 9

2012 12

2011 3

2010 12

2009 4

2008 1

2007 2

2003 1

2001 2

1999 1

open ︾

Keywords

Three Gorges Project ship lift 5

Taizhou Bridge 4

Three Gorges Project 3

crane 3

dynamic characteristics 3

beam 2

concrete 2

offshore wind farm 2

ship lift 2

suspension bridge 2

three-tower suspension bridge 2

3D finite element 1

Algebraic Method (AGM) 1

BNLAS 1

Bailey rack 1

Bipolar electrodes 1

Black-odorous water 1

Canton Tower 1

Composite cross arms 1

open ︾

Search scope:

排序: Display mode:

Safety and serviceability assessment for high-rise tower crane to turbulent winds

Zhi SUN, Nin HOU, Haifan XIANG

Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 1,   Pages 18-24 doi: 10.1007/s11709-009-0009-2

Abstract: Tower cranes are commonly used facilities for the construction of high-rise structures.This paper proposes a general scheme for safety and serviceability assessment of high-rise tower craneSpatially correlated wind velocity field at the location of the tower crane was first simulated usingThe proposed method is then adopted for analyzing the buffeting response of an in-use tower crane under

Keywords: tower crane     buffeting response     wind velocity     modeling    

Analyzing the nonlinear vibrational wave differential equation for the simplified model of Tower Cranes

M.R. AKBARI,D.D. GANJI,A.R. AHMADI,Sayyid H. Hashemi KACHAPI

Frontiers of Mechanical Engineering 2014, Volume 9, Issue 1,   Pages 58-70 doi: 10.1007/s11465-014-0289-7

Abstract:

In the current paper, a simplified model of Tower Cranes has been presented in order to investigate

Keywords: Algebraic Method (AGM)     tower crane     oscillating system     angular frequency    

Developing and applicating of Guangdong Zhongyuan shipbuilding gantry crane with function of turning

Huang Yaoyi,Wang Jingquan,Zhang Zhihua,Wang Xu

Strategic Study of CAE 2012, Volume 14, Issue 7,   Pages 40-45

Abstract: state about The developing and applicating successfully of Guangdong Zhongyuan shipbuilding gantry cranetechnique of turning over ship-section in series, The designs for rigid leg in type of double columns towerand sightseeing lift to land up The crane, The design and manufacture technology for The gantry doublebox-beams designing as divided into two layers, The technology for moving repair crane with The upper

Keywords: shipbuilding     crane     development     application    

The realization of automatic positioning of crane in high precise in the storehouse for nuclear waste

Luan Xiuchun,Han Weishi,Wang Junling,Yang Aiguang

Strategic Study of CAE 2010, Volume 12, Issue 3,   Pages 45-50

Abstract:

This paper sets forth the realization of automatic positioning of crane

Keywords: nuclear waste     crane     automatic control     positioning    

Practice and Experience of Canton Tower Project Management

Rong-hua Yi

Frontiers of Engineering Management 2016, Volume 3, Issue 1,   Pages 74-79 doi: 10.15302/J-FEM-2016013

Abstract: This paper presents a brief introduction about the preliminary consulting and tender agent of Canton Towersituation of the whole-process supervision on the construction site, and a general summary of the Canton Tower

Keywords: Canton Tower     consultation     tender agent     whole-process     supervision    

Power fluctuation and power loss of wind turbines due to wind shear and tower shadow

Binrong WEN, Sha WEI, Kexiang WEI, Wenxian YANG, Zhike PENG, Fulei CHU

Frontiers of Mechanical Engineering 2017, Volume 12, Issue 3,   Pages 321-332 doi: 10.1007/s11465-017-0434-1

Abstract: This study investigates the effects of wind shear and tower shadow on power output in terms of powerFirst, wind speed models, particularly the wind shear model and the tower shadow model, are describedThe widely accepted tower shadow model is modified in view of the cone-shaped towers of modern large-scalePower fluctuation and power loss due to wind shear and tower shadow are analyzed by performing theoreticalResults indicate that power fluctuation is mainly caused by tower shadow, whereas power loss is primarily

Keywords: wind turbine     wind shear     tower shadow     power fluctuation     power loss    

Impacts of solar multiple on the performance of direct steam generation solar power tower plant with

Yan LUO, Xiaoze DU, Lijun YANG, Chao XU, Muhammad AMJAD

Frontiers in Energy 2017, Volume 11, Issue 4,   Pages 461-471 doi: 10.1007/s11708-017-0503-5

Abstract: two key design parameters for revealing the performance of direct steam generation (DSG) solar power towerTaking the dual-receiver DSG solar power tower plant with a given size of solar field equivalent electricity

Keywords: direct steam generation     solar power tower     solar multiple     thermal energy storage capacity     levelized cost    

Precision Blasting Excavation of Underground Workshop Crane Beam of Rock Wall in Complicated Geology

Li Changneng,Xu Chengguang

Strategic Study of CAE 2014, Volume 16, Issue 11,   Pages 42-47

Abstract: Characteristics of crane beam of rock wall construction embodied in width of rock bench, huge bearing

Keywords: Xiang jiaba hydraulic power station     underground workshop     crane beam of rock wall     precision blasting    

Taizhou Bridge—the first kilometer level three-tower two-span suspension bridge in the world

Zhong Jianchi

Strategic Study of CAE 2010, Volume 12, Issue 4,   Pages 4-8

Abstract: The middle tower of the bridge adopts longitudinal shape of herringbone fashion for the first time inThe foundation of the middle tower is the deepest caisson in the earth under water.carried out to construct the great engineering project, such as the design techniques of the three-towerscale caisson foundation, the manufacture, connection techniques of steel and concrete in the middle towerwelding of extra thick steel plate and manufacturing and control of abnormal sections of the middle tower

Keywords: three-tower suspension bridge     innovation     design     caisson in water     herringbone steel tower    

Choosing configurations of transmission line tower grounding by back flashover probability value

Dmitry KUKLIN

Frontiers in Energy 2016, Volume 10, Issue 2,   Pages 213-226 doi: 10.1007/s11708-016-0398-6

Abstract: of the fact that to choose the optimum design of grounding, the calculation model should include the tower

Keywords: grounding     transmission line tower     back flashover probability     FDTD method    

Design on the board of spiral cooling tower

Huang Rui

Strategic Study of CAE 2008, Volume 10, Issue 11,   Pages 43-46

Abstract:

A spiral structure of cooling tower is designed for heat exchange ofgas & liquid.The method includes the locating of the outer spiral line on the tower wall and theAccording to the basic parameters of cooling tower, the critic parameters of spiral curving board canbe ascertainable, so as to accurately link up the tower board with the tower wall and the inner axial

Keywords: cooling tower     board     spiral curving board     topology    

Anti-sliding safety assessment for main saddle on middle tower of Taizhou Bridge

Ruan Xin,Ruan Jing,Chen Airong and Guo Ji

Strategic Study of CAE 2012, Volume 14, Issue 5,   Pages 71-74

Abstract: Three methods to assess the safety of saddle sliding on middle tower of the Taizhou Bridge are presentedAll three assessment results indicate that the middle tower saddle of the Taizhou Yangtze River Bridge

Keywords: three-tower two-span suspension bridge     middle tower saddle     deterministic assessment     probabilistic    

Research on Rubber Tired Gantry Crane Scheduling of Port Container Terminal

Wei Zhong,Shen Jinsheng,Xiao Rongna,Zhang Zhiwen,Shi Dinghuan

Strategic Study of CAE 2007, Volume 9, Issue 8,   Pages 47-51

Abstract:  At container terminal,  rubber tired gantry crane has already been a bottleneck of terminal This paper studies the rubber tired gantry crane scheduling of port container terminal in the quantitative

Keywords: container terminal     yard     rubber tired gantry crane (RTGC)     scheduling    

Developing and practice of QLY2150-full circle slewing and tyre type crane for erecting wind power station

Huang Yaoyi,Zhang Zhihua,Jing Haizhou,Dai Yu

Strategic Study of CAE 2010, Volume 12, Issue 11,   Pages 105-112

Abstract: inventions and realizing methods about the developing subject of QLY2150-full circle slewing and tyre type cranebe used in construction of wind power station , and pointed out some great superiorities of this new crane

Keywords: wind power station     special purpose     crane     new type     developing     practice    

Contribution of Design Innovation to Oriental Pearl Tower & Menara Jakarta

Jiang Huancheng

Strategic Study of CAE 1999, Volume 1, Issue 1,   Pages 30-35

Abstract:

The project Oriental Pearl Tower, 463.85 m in height, ranked the first in Asia and the third in the
  The success in both Shanghai Oriental Pearl Tower construction and the design competitionIn the project of Shanghai Tower, designers used a string of pearls to symbolize Shanghai, hanging onFurthermore, a series of advanced technologies were employed in the tower, such as to use a prestressedMenara Jakarta, designers kept and developed all advantages and overcome some shortages in Shanghai Tower

Keywords: design innovation     TV tower     space frame     diagonal strut     sphere     steel pole     hanging structure    

Title Author Date Type Operation

Safety and serviceability assessment for high-rise tower crane to turbulent winds

Zhi SUN, Nin HOU, Haifan XIANG

Journal Article

Analyzing the nonlinear vibrational wave differential equation for the simplified model of Tower Cranes

M.R. AKBARI,D.D. GANJI,A.R. AHMADI,Sayyid H. Hashemi KACHAPI

Journal Article

Developing and applicating of Guangdong Zhongyuan shipbuilding gantry crane with function of turning

Huang Yaoyi,Wang Jingquan,Zhang Zhihua,Wang Xu

Journal Article

The realization of automatic positioning of crane in high precise in the storehouse for nuclear waste

Luan Xiuchun,Han Weishi,Wang Junling,Yang Aiguang

Journal Article

Practice and Experience of Canton Tower Project Management

Rong-hua Yi

Journal Article

Power fluctuation and power loss of wind turbines due to wind shear and tower shadow

Binrong WEN, Sha WEI, Kexiang WEI, Wenxian YANG, Zhike PENG, Fulei CHU

Journal Article

Impacts of solar multiple on the performance of direct steam generation solar power tower plant with

Yan LUO, Xiaoze DU, Lijun YANG, Chao XU, Muhammad AMJAD

Journal Article

Precision Blasting Excavation of Underground Workshop Crane Beam of Rock Wall in Complicated Geology

Li Changneng,Xu Chengguang

Journal Article

Taizhou Bridge—the first kilometer level three-tower two-span suspension bridge in the world

Zhong Jianchi

Journal Article

Choosing configurations of transmission line tower grounding by back flashover probability value

Dmitry KUKLIN

Journal Article

Design on the board of spiral cooling tower

Huang Rui

Journal Article

Anti-sliding safety assessment for main saddle on middle tower of Taizhou Bridge

Ruan Xin,Ruan Jing,Chen Airong and Guo Ji

Journal Article

Research on Rubber Tired Gantry Crane Scheduling of Port Container Terminal

Wei Zhong,Shen Jinsheng,Xiao Rongna,Zhang Zhiwen,Shi Dinghuan

Journal Article

Developing and practice of QLY2150-full circle slewing and tyre type crane for erecting wind power station

Huang Yaoyi,Zhang Zhihua,Jing Haizhou,Dai Yu

Journal Article

Contribution of Design Innovation to Oriental Pearl Tower & Menara Jakarta

Jiang Huancheng

Journal Article